Skip to content

Upgrade prawn-svg #3918

Upgrade prawn-svg

Upgrade prawn-svg #3918

Re-run triggered December 17, 2023 12:12
Status Failure
Total duration 6m 49s
Artifacts

ci.yml

on: pull_request
activate
0s
activate
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

25 errors
build (ubuntu-latest, 3.2, upstream)
Process completed with exit code 1.
build (ubuntu-latest, 3.0)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (ubuntu-latest, 3.0)
Process completed with exit code 1.
build (windows-latest, 2.7, ~> 2.2)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (windows-latest, 2.7, ~> 2.2)
The operation was canceled.
build (windows-latest, 3.2, 0.8.0)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (windows-latest, 3.2, 0.8.0)
The operation was canceled.
build (windows-latest, 3.2, ~> 2.2)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (windows-latest, 3.2, ~> 2.2)
The operation was canceled.
build (ubuntu-latest, 3.2, ~> 4.0.0, primary)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (ubuntu-latest, 3.2, ~> 4.0.0, primary)
The operation was canceled.
build (ubuntu-latest, jruby-9.2.21.0, ~> 2.2)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (ubuntu-latest, jruby-9.2.21.0, ~> 2.2)
The operation was canceled.
build (ubuntu-latest, 2.7, ~> 2.2)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (ubuntu-latest, 2.7, ~> 2.2)
The operation was canceled.
build (macos-latest, 3.2)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (macos-latest, 3.2)
The operation was canceled.
build (windows-latest, jruby-9.2.21.0, ~> 2.2)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (windows-latest, jruby-9.2.21.0, ~> 2.2)
The operation was canceled.
build (ubuntu-latest, jruby-9.4.2.0, ~> 2.2)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (ubuntu-latest, jruby-9.4.2.0, ~> 2.2)
The operation was canceled.
build (ubuntu-latest, 2.7, 2.0.10, ~> 2.0.0)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (ubuntu-latest, 2.7, 2.0.10, ~> 2.0.0)
The operation was canceled.
build (windows-latest, jruby-9.4.2.0, ~> 2.2)
The job was canceled because "ubuntu-latest_3_2_upstrea" failed.
build (windows-latest, jruby-9.4.2.0, ~> 2.2)
The operation was canceled.