Skip to content

fix: use projects resolver to check for data connections #5333

fix: use projects resolver to check for data connections

fix: use projects resolver to check for data connections #5333

Status Failure
Total duration 2m 36s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yml

on: push
Matrix: Pylint test
Matrix: pyright
Matrix: Unit and integration tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Unit and integration tests (ubuntu-latest, 3.8)
Process completed with exit code 1.
Unit and integration tests (windows-latest, 3.8)
The job was canceled because "ubuntu-latest_3_8" failed.
Unit and integration tests (windows-latest, 3.8)
The operation was canceled.
Unit and integration tests (ubuntu-latest, 3.12)
The job was canceled because "ubuntu-latest_3_8" failed.
Unit and integration tests (ubuntu-latest, 3.12)
The operation was canceled.