fix: use projects resolver to check for data connections #5334
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
ci.yml
on: push
pre-commit
1m 16s
markdown-link-check
42s
build-test
1m 3s
doc-build-test
1m 17s
Matrix: Pylint test
Matrix: pyright
Matrix: Unit and integration tests
Annotations
5 errors
Unit and integration tests (ubuntu-latest, 3.8)
Process completed with exit code 1.
|
Unit and integration tests (windows-latest, 3.8)
The job was canceled because "ubuntu-latest_3_8" failed.
|
Unit and integration tests (windows-latest, 3.8)
The operation was canceled.
|
Unit and integration tests (ubuntu-latest, 3.12)
The job was canceled because "ubuntu-latest_3_8" failed.
|
Unit and integration tests (ubuntu-latest, 3.12)
The operation was canceled.
|